Ship Project Status Report
(Blue Book)

Blue Book Last Updated: Friday, September 11, 2026 at 11:22 AM

Select by Ship Name: 

Select by Ship Hull: 

 

PINCKNEY (DDG 91)
PROJECT INSTALL AVAIL WORK SCOPE SURVEY STATUS
FY 15 DSRA1   12/15/2014 - 12/11/2015 7 / 84 (b)   8 / 25 (f) 06/19/2012 Complete
FY 18 SRA2-1   02/12/2018 - 08/31/2018 1 / 48 (b)   2 / 10 (f) 04/21/2015 Complete
FY 22 DMP   10/04/2021 - 03/15/2024 7 / 207 (b)   10 / 52 (f) 04/21/2015 Complete
  FY 26 DMP2   07/15/2026 - 02/17/2029 16 / 40 (b)   13 / 30 (f) 01/08/2025 Active
FY 31 SRA3-1   09/15/2031 - 04/26/2032 7 / 84 (b)   8 / 25 (f) 04/03/2027 Active

 

S H I P    H A B I T A B I L I T Y    P R O J E C T    D A T A
PINCKNEY (DDG 91) 23145-264
ACTIVE PROJECT
CLASS: DDG 51
(Flight IIA Variant)
HOMEPORT: SDGO PLANNING YARD: BATH
POC: Stephen Ferderer, CNSP N43 PHONE: 619-437-2757
ENGINEERING WORK SCOPE
SURVEY AVAILABILITY: FY 25 CMAV
SURVEY DATES: 01/20/2025 - 02/28/2025
SURVEY LOCATION: SDGO
DESIGN AGENT: DELPHINUS
INSTALLATION WORK SCOPE
INSTALL AVAILABILITY: FY 26 DMP2     (948 days)
INSTALL DATES: 07/15/2026 - 02/17/2029
INSTALL LOCATION: SDGO
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 0 / 0 0 / 0 0 / 0 16 / 40 16 / 40
SANITARY SPACE / FIXTURES: 0 / 0 0 / 0 0 / 0 9 / 30 9 / 30
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 0 / 0 0 / 0 0 / 0 16 / 40 16 / 40
SANITARY SPACE / FIXTURES: 0 / 0 0 / 0 0 / 0 13 / 30 13 / 30
OTHER PROJECT:
PROJECT NO(S): BOFF-E1373, HOFF-E1374
REMARKS: DESIGN SURVEY ACCOMPLISHED 3/1/22 - 3/15/22 BUT WAS PRIOR TO SLQ-32 V7 SHIPALT INSTALLATION. A SECOND DESIGN SURVEY IS NOW REQUIRED BEFORE DRAWINGS CAN BE ISSUED .
OTHER PROJ:
REMARKS: THE INTENT OF SHIPALT DDG 51-81670, OFFICER BERTHING INCREASE WILL BE ACCOMPLISHED WITH THIS INSTALLATION AS NOTED IN NDE.
HABITABILITY DRAWING NUMBERS
DISCIPLINE HAB DRAWING NUMBER NAVSEA DRAWING NUMBER
ARRANGEMENT-OFFICER STATEROOM 22-DDG 91-05  - 640 - 8866689  REV -
ARRANGEMENT-OFFICER SANITARY 22-DDG 91-06  - 644 - 8866690  REV -
VENTILATION-OFFICER BERTHING 22-DDG 91-14  - 512 - 8866691  REV -
VENTILATION-OFFICER SANITARY 22-DDG 91-15  - 512 - 8866692  REV -
PIPE-OFFICER SANITARY 22-DDG 91-22  - 505 - 8866693  REV -
PIPE-OFFICER LIVING 22-DDG 91-25  - 505 - 8866694  REV -
ELECTRICAL-OFFICER BERTHING 22-DDG 91-37  - 331 - 8866695  REV -
ELECTRICAL-OFFICER SANITARY 22-DDG 91-38  - 331 - 8866696  REV -
PROJECT NUMBERS(s) AND COMPARTMENTS
BOFF-S1373
04-158-2-L (1)
02-126-1-L (3)
02-126-2-L (3)
02-136-1-L (3)
02-136-2-L (3)
02-136-3-L (1)
02-145-1-L (3)
02-145-2-L (3)
02-146-1-L (0)
02-158-7-L (3)
01-158-4-L (1)
01-300-4-L (3)
01-314-1-L (3)
01-314-2-L (2)
2-338-4-L (2)
2-358-2-L (6)
 PT 16 (40)
HOFF-S1374
04-158-1-L (3)
02-126-0-L (3)
02-126-3-L (3)
02-158-1-A (1)
02-158-3-L (6)
02-166-2-L (2)
01-158-2-L (3)
01-330-1-A (0)
01-334-1-A (0)
01-338-1-L (5)
2-350-2-A (0)
2-350-4-L (4)
2-354-2-A (0)
 PT 13 (30)
MILESTONES SCHEDULED ACTUAL EVENTS
09/13/2024 01/08/2025 01/08/2025 START SURVEY
10/11/2024 01/22/2025 01/22/2025 COMPLETE SURVEY
11/14/2024 02/22/2025 03/10/2025 SEND SURVEY REPORT TO PM
10/03/2024 12/10/2024 12/09/2024 TC ISSUE ADVANCE PLANNING NOTICE TO SHIP
11/01/2024 01/09/2025 01/03/2025 SHIP RESPOND TO ADVANCE PLANNING NOTICE
05/21/2025 07/28/2025 08/21/2025 SO SUBMIT DRAWINGS TO PM & PY
05/21/2025 07/28/2025 08/25/2025 SO DELIVER PROCUREMENT INFORMATION PACKAGE TO PM
01/16/2026 01/16/2026 Pending PROJECT MATERIAL PROCUREMENT FUNDED
04/15/2026 04/15/2026 Pending PROJECT INSTALLATION FUNDED
07/15/2026 07/15/2026 07/15/2026 START AVAILABILITY
07/15/2026 07/15/2026 07/15/2026 START PROJECT
02/17/2029 02/17/2029 Pending COMPLETE PROJECT
02/17/2029 02/17/2029 Pending COMPLETE AVAILABILITY
Project Record Last Updated: 08/03/2026