Ship Project Status Report
(Blue Book)

Blue Book Last Updated: Friday, September 11, 2026 at 11:22 AM

Select by Ship Name: 

Select by Ship Hull: 

 

RUSSELL (DDG 59)
PROJECT INSTALL AVAIL WORK SCOPE SURVEY STATUS
FY 09 SRA   04/08/2009 - 06/12/2009 1 / 96 (b)   0 / 0 (f) 09/30/2008 Complete
FY 11 SRA2-3   04/13/2011 - 07/15/2011 2 / 84 (b)   0 / 0 (f) 08/24/2010 Complete
FY 13 EDSRA   07/19/2013 - 10/30/2014 5 / 120 (b)   10 / 43 (f) 08/24/2010 Complete
FY 16 SRA3-1   07/11/2016 - 05/04/2018 3 / 18 (b)   3 / 11 (f) 08/24/2010 Complete
FY 21 SRA3-2   07/26/2021 - 01/25/2023 1 / 96 (b)   3 / 20 (f) 10/04/2016 Complete
FY 25 DSRA3   05/05/2025 - 11/10/2026 16 / 34 (b)   8 / 26 (f) 08/24/2021 Complete
  FY 25 DSRA3   05/05/2025 - 11/10/2026 0 / 0 (b)   0 / 0 (f) NA Complete
FY 28 ISRA6-1   08/15/2028 - 01/11/2029 5 / 33 (b)   0 / 0 (f) 03/02/2027 Active

 

S H I P    H A B I T A B I L I T Y    P R O J E C T    D A T A
RUSSELL (DDG 59) 21821-253R
PROJECT COMPLETED
CLASS: DDG 51
(Flight I Variant)
HOMEPORT: SDGO PLANNING YARD: BATH
POC: Stephen Ferderer, CNSP N43 PHONE: 619-437-2757
ENGINEERING WORK SCOPE
SURVEY AVAILABILITY: NA
SURVEY DATES: -
SURVEY LOCATION:
DESIGN AGENT: DELPHINUS
INSTALLATION WORK SCOPE
INSTALL AVAILABILITY: FY 25 DSRA3     (554 days)
INSTALL DATES: 05/05/2025 - 11/10/2026
INSTALL LOCATION: SDGO
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0
SANITARY SPACE / FIXTURES: 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0
SANITARY SPACE / FIXTURES: 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0
OTHER PROJECT:
PROJECT NO(S): NO DESIGN PROJECT NUMBERS
REMARKS: NO DRAWINGS VALIDATION WILL BE DONE
OTHER PROJ:
REMARKS: SHIP WANTS TO DO A ONE FOR ONE REPLACEMENT PROJECT. OUTSIDE OF THE HAB PROGRAM.
HABITABILITY DRAWING NUMBERS
DISCIPLINE HAB DRAWING NUMBER NAVSEA DRAWING NUMBER
ARRANGEMENT-BERTHING 13-DDG 59-01  E 640 - 8470069  REV E
ARRANGEMENT-SANITARY 13-DDG 59-03  E 644 - 8470072  REV E
VENTILATION-BERTHING 13-DDG 59-10  E 512 - 8470070  REV E
VENTILATION-SANITARY 13-DDG 59-12  E 512 - 8470073  REV E
PIPE-SANITARY 13-DDG 59-20  E 505 - 8470074  REV E
ELECTRICAL-BERTHING 13-DDG 59-30  E 331 - 8470071  REV E
ELECTRICAL-SANITARY 13-DDG 59-32  E 331 - 8470075  REV E
REV A & REV B DRAWINGS WILL BE REPACKAGED WITHOUT VALIDATION FOR THIS REPAIR PROJECT. NO 52 DRAWING IS REQUIRED.
PROJECT NUMBERS(s) AND COMPARTMENTS
BRPR-S5385
2-78-01-L (75)
2-116-1-T (0)
3-97-02-L (42)
 PT 3 (117)
HRPR-S5390
2-97-01-L (14)
2-102-1-A (1)
3-97-01-L (9)
3-102-1-A (1)
 PT 4 (25)
MILESTONES SCHEDULED ACTUAL EVENTS
03/11/2024 03/29/2024 03/27/2024 SO SUBMIT DRAWINGS TO PM & PY
03/11/2024 04/01/2024 03/27/2024 SO DELIVER PROCUREMENT INFORMATION PACKAGE TO PM
05/05/2025 05/05/2025 05/05/2025 START AVAILABILITY
05/05/2025 05/05/2025 05/05/2025 START PROJECT
11/10/2026 11/10/2026 07/28/2026 COMPLETE PROJECT
11/10/2026 11/10/2026 07/28/2026 COMPLETE AVAILABILITY
Project Record Last Updated: 09/02/2026