Ship Project Status Report
(Blue Book)

Blue Book Last Updated: Friday, September 11, 2026 at 11:22 AM

Select by Ship Name: 

Select by Ship Hull: 

 

BOXER (LHD 4)
PROJECT INSTALL AVAIL WORK SCOPE SURVEY STATUS
FY 10 DPMA6   10/14/2009 - 06/09/2010 1 / 133 (b)   4 / 27 (f) 03/14/2009 Complete
FY 12 PMA   01/11/2012 - 09/07/2012 1 / 165 (b)   4 / 33 (f) 10/14/2009 Complete
FY 14 PMA3-2   07/07/2014 - 03/24/2015 2 / 354 (b)   4 / 51 (f) 03/13/2012 Complete
FY 17 PMA3-3   11/28/2016 - 03/02/2018 1 / 216 (b)   4 / 35 (f) 03/13/2012 Complete
FY 20 DSRA3   06/15/2020 - 03/30/2022 7 / 518 (b)   15 / 92 (f) 04/18/2017 Complete
  FY 27 SRA4-1   03/01/2027 - 01/13/2029 5 / 476 (b)   12 / 92 (f) 11/03/2020 Active
FY 31 DSRA4   02/20/2031 - 05/06/2032 4 / 460 (b)   10 / 73 (f) 03/23/2027 Active

 

S H I P    H A B I T A B I L I T Y    P R O J E C T    D A T A
BOXER (LHD 4) 21808-272
ACTIVE PROJECT
CLASS: LHD 1 HOMEPORT: SDGO PLANNING YARD: NNSY
POC: Stephen Ferderer, CNSP N43 PHONE: 619-437-2757
ENGINEERING WORK SCOPE
SURVEY AVAILABILITY: FY 20 DSRA3
SURVEY DATES: 06/15/2020 - 03/30/2022
SURVEY LOCATION: SDGO
DESIGN AGENT: DELPHINUS
INSTALLATION WORK SCOPE
INSTALL AVAILABILITY: FY 27 SRA4-1     (684 days)
INSTALL DATES: 03/01/2027 - 01/13/2029
INSTALL LOCATION: SDGO
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 3 / 393 2 / 83 0 / 0 0 / 0 5 / 476
SANITARY SPACE / FIXTURES: 8 / 67 4 / 24 0 / 0 0 / 0 12 / 91
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 3 / 393 2 / 83 0 / 0 0 / 0 5 / 476
SANITARY SPACE / FIXTURES: 8 / 67 4 / 25 0 / 0 0 / 0 12 / 92
OTHER PROJECT:
PROJECT NO(S): BCPO-E0440, BENL-E0441, HCPO-E0448, HENL-E0449
REMARKS: REV - DRAWINGS ISSUED 04/12/2024 BUT NOT INSTALLED.
DRAWINGS WILL BE RE-ISSUED AS REV A.
OTHER PROJ:
REMARKS: 2-39.5-3-L (ACCESS) IS INCLUDED IN WORK SCOPE.
HABITABILITY DRAWING NUMBERS
DISCIPLINE HAB DRAWING NUMBER NAVSEA DRAWING NUMBER
ARRANGEMENT-BERTHING 21-LHD 4-01  E 640 - 8866598  REV A
ARRANGEMENT-SANITARY 21-LHD 4-03  E 644 - 8866599  REV A
VENTILATION-BERTHING 21-LHD 4-10  E 512 - 8866600  REV A
VENTILATION-SANITARY 21-LHD 4-12  E 512 - 8866601  REV A
PIPE-FLUSHING WATER 21-LHD 4-26  E 521 - 8866602  REV A
PIPE-PLUMBING DRAIN 21-LHD 4-27  E 528 - 8866603  REV A
PIPE - POTABLE 21-LHD 4-28  E 533 - 8866604  REV A
ELECTRICAL-BERTHING 21-LHD 4-30  E 331 - 8866605  REV A
ELECTRICAL-SANITARY 21-LHD 4-32  E 331 - 8866606  REV A
ELECTRICAL-POWER SYSTEM 21-LHD 4-39  E 321 - 8866607  REV A
VENTILATION-MFG DET 21-LHD 4-52  E 512 - 8866608  REV A
PROJECT NUMBERS(s) AND COMPARTMENTS
BCPO-S0440
2-41-01-L (74)
2-43-0-L (9)
 PT 2 (83)
BENL-S0441
2-33-0-L (249)
2-39.5-3-L (0)
3-25-0-L (144)
 PT 3 (393)
HCPO-S0448
2-41-0-L (7)
2-41-1-L (7)
2-41-3-L (5)
2-42.5-1-L (6)
 PT 4 (25)
HENL-S0449
2-39-0-L (15)
2-39.5-0-L (16)
2-39.5-1-L (10)
2-39.5-2-A (1)
3-31-0-L (10)
3-31-2-L (9)
3-32-0-L (5)
3-33-3--A (1)
 PT 8 (67)
MILESTONES SCHEDULED ACTUAL EVENTS
05/01/2025 11/03/2020 11/03/2020 START SURVEY
05/30/2025 11/14/2020 11/14/2020 COMPLETE SURVEY
07/01/2025 12/14/2020 12/01/2020 SEND SURVEY REPORT TO PM
05/20/2025 04/03/2025 04/01/2025 TC ISSUE ADVANCE PLANNING NOTICE TO SHIP
06/19/2025 05/02/2025 04/07/2025 SHIP RESPOND TO ADVANCE PLANNING NOTICE
01/05/2026 01/02/2026 11/17/2025 SO SUBMIT DRAWINGS TO PM & PY
01/05/2026 01/02/2026 11/18/2025 SO DELIVER PROCUREMENT INFORMATION PACKAGE TO PM
09/02/2026 09/02/2026 Pending PROJECT MATERIAL PROCUREMENT FUNDED
11/30/2026 11/30/2026 Pending PROJECT INSTALLATION FUNDED
03/01/2027 03/01/2027 Pending START AVAILABILITY
03/01/2027 03/01/2027 Pending START PROJECT
01/13/2029 01/13/2029 Pending COMPLETE PROJECT
01/13/2029 01/13/2029 Pending COMPLETE AVAILABILITY
Project Record Last Updated: 09/08/2026