BLUE RIDGE (LCC 19)
PROJECT INSTALL AVAIL WORK SCOPE SURVEY STATUS
FY 14 SRA   09/17/2014 - 03/04/2015 11 / 143 (b)   4 / 41 (f) 10/01/2012 Complete
FY 15 ESRA   09/16/2015 - 02/19/2016 7 / 257 (b)   1 / 7 (f) 02/14/1995 Complete
FY 16 EDSRA   06/01/2016 - 10/10/2018 9 / 200 (b)   6 / 10 (f) NA Complete
FY 21 SRA   05/26/2021 - 12/12/2022 4 / 272 (b)   3 / 16 (f) 09/11/2019 Complete
  FY 26 DSRA   09/28/2026 - 08/28/2028 10 / 468 (b)   10 / 102 (f) 10/20/2021 Active
FY 31 SRA   12/09/2030 - 08/11/2031 15 / 55 (b)   2 / 7 (f) 11/03/2026 Active
FY 34 SRA   01/23/2034 - 09/25/2034 12 / 36 (b)   1 / 9 (f) 04/14/2031 Active

 

S H I P    H A B I T A B I L I T Y    P R O J E C T    D A T A
BLUE RIDGE (LCC 19) 05840-264
ACTIVE PROJECT
CLASS: LCC 19 HOMEPORT: YOKO PLANNING YARD: PSNSY
POC: Stephen Ferderer, CNSP N43 PHONE: 619-437-2757
ENGINEERING WORK SCOPE
SURVEY AVAILABILITY: FY 21 SRA
SURVEY DATES: 05/26/2021 - 12/12/2022
SURVEY LOCATION: SRFYOKO
DESIGN AGENT: DELPHINUS
INSTALLATION WORK SCOPE
INSTALL AVAILABILITY: FY 26 DSRA     (700 days)
INSTALL DATES: 09/28/2026 - 08/28/2028
INSTALL LOCATION: SRFYOKO
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 8 / 438 2 / 30 0 / 0 0 / 0 10 / 468
SANITARY SPACE / FIXTURES: 8 / 88 2 / 14 0 / 0 0 / 0 10 / 102
ITEM CREW CPO TROOP OFFICER TOTAL
LIVING SPACES / BERTHS: 8 / 438 2 / 30 0 / 0 0 / 0 10 / 468
SANITARY SPACE / FIXTURES: 8 / 88 2 / 14 0 / 0 0 / 0 10 / 102
OTHER PROJECT:
PROJECT NO(S): BCPO-E1378, BENL-E1379, HCPO-E1357, HENL-E1377
REMARKS:
OTHER PROJ:
REMARKS: PROPOSED SKED CHANGE 28SEP26-28AUG28 (701D) VICE 21JUL26-20JUN28 (701D)
HABITABILITY DRAWING NUMBERS
DISCIPLINE HAB DRAWING NUMBER NAVSEA DRAWING NUMBER
ARRANGEMENT-BERTHING 22-LCC 19-01  - 640 - 8866665  REV -
ARRANGEMENT-SANITARY 22-LCC 19-03  - 644 - 8866666  REV -
VENTILATION-BERTHING 22-LCC 19-10  - 512 - 8866667  REV -
VENTILATION-SANITARY 22-LCC 19-12  - 512 - 8866668  REV -
PIPE-SANITARY 22-LCC 19-20  - 505 - 8866669  REV -
ELECTRICAL-BERTHING 22-LCC 19-30  - 331 - 8866670  REV -
ELECTRICAL-SANITARY 22-LCC 19-32  - 331 - 8866671  REV -
VENTILATION-MFG DET 22-LCC 19-52  - 512 - 8866672  REV -
PROJECT NUMBERS(s) AND COMPARTMENTS
BCPO-S1378
4-64-1-L (15)
4-64-2-L (15)
 PT 2 (30)
BENL-S1379
5-40-0-L (75)
5-40-01-L (87)
5-46-1-L (0)
5-46-2-L (0)
5-52-0-L (180)
5-60-0-L (0)
5-64-0-L (96)
5-64-1-L (0)
 PT 8 (438)
HCPO-S1357
4-74-1-L (7)
4-74-2-L (7)
 PT 2 (14)
HENL-S1377
5-40-1-L (13)
5-40-2-L (14)
5-58-1-L (14)
5-58-2-L (13)
5-101-1-L (9)
5-103-2-L (10)
5-104-1-L (9)
5-105-2-L (6)
 PT 8 (88)
MILESTONES SCHEDULED ACTUAL EVENTS
11/27/2024 10/20/2021 10/20/2021 START SURVEY
12/27/2024 11/04/2021 11/04/2021 COMPLETE SURVEY
01/28/2025 12/03/2021 12/01/2021 SEND SURVEY REPORT TO PM
12/17/2024 06/26/2024 05/29/2024 TC ISSUE ADVANCE PLANNING NOTICE TO SHIP
01/16/2025 01/16/2025 Pending SHIP RESPOND TO ADVANCE PLANNING NOTICE
08/04/2025 08/01/2025 09/08/2024 SO SUBMIT DRAWINGS TO PM & PY
08/04/2025 08/01/2025 09/09/2024 SO DELIVER PROCUREMENT INFORMATION PACKAGE TO PM
04/01/2026 04/01/2026 Pending PROJECT MATERIAL PROCUREMENT FUNDED
06/29/2026 06/29/2026 Pending PROJECT INSTALLATION FUNDED
09/28/2026 09/28/2026 Pending START AVAILABILITY
09/28/2026 09/28/2026 Pending START PROJECT
08/28/2028 08/28/2028 Pending COMPLETE PROJECT
08/28/2028 08/28/2028 Pending COMPLETE AVAILABILITY
Project Record Last Updated: 05/29/2026