Description of Project Types: |
| |
Berthing Projects: |
| |
|
BCPO |
Complete Upgrade of Chief Petty Officer's (CPO) Berthing Compartment(s)
INSTALLATION REQUIREMENTS:
|
a. |
Replace berths with CPO modular berths with privacy partitions and
berth curtains arranged in six-person cubicles, as practical, with
ten percent long berths. Total number of new berths will be equal
to the existing berthing. |
|
b. |
Redistribute air supply terminals to provide overhead diffusers
within each berth cubicle. |
|
c. |
Redistribute overhead lighting to conform to new arrangements.
Provide one berth light per accommodation and mirror lights as
required. |
|
d. |
Improve traffic flow
and privacy, as practical, through the arrangement of furniture. |
|
e. |
Provide lockers for stowage of clothing and personal effects to meet
or exceed minimums required per accommodations. For CPO (E7-E9)
provide 14 cubic feet of locker space, 18 inches hanging space and 0.75 cubic feet of soiled laundry
stowage. |
|
f. |
Provide a means of secondary egress if one does not exist and
berthing capacity exceeds 21 personnel. |
|
g. |
Provide recreation/lounge area in berthing compartments segregated
from sleeping area to the maximum extent feasible. |
|
h. |
Provide storage for iron and ironing board. |
|
i. |
Provide bulletin boards, watch-quarter boards and mirrors. |
|
j. |
Prepare and preserve decks, bulkheads and overheads. |
|
k. |
Replace deck covering. |
|
l. |
Replace any damaged insulation. |
|
m. |
Paint
bulkheads and overheads. |
|
|
| |
|
BENL |
Complete
Upgrade of Crew Berthing Compartment(s)
INSTALLATION REQUIREMENTS:
|
a. |
Replace berths
with modular berths with privacy partitions and berth curtains
arranged in six-person cubicles, as practical, with ten percent long
berths. Total number of new berths will be equal to the
existing berthing. |
|
b. |
Redistribute
air supply terminals to provide overhead diffusers within each berth
cubicle. |
|
c. |
Redistribute overhead lighting to conform to new arrangements.
Provide one berth light per accommodation and mirror lights as
required. |
|
d. |
Improve traffic flow
and privacy, as practical, through the arrangement of furniture. |
|
e. |
Provide lockers for stowage of clothing and personal effects to meet
or exceed
reference (a). |
|
f. |
Provide a means of secondary egress if one does not exist and
berthing capacity exceeds 21 personnel. |
|
g. |
Provide recreation/lounge area in berthing compartments segregated
from sleeping area to the maximum extent feasible |
|
h. |
Provide storage for iron and ironing board. |
|
i. |
Provide bulletin boards, watch-quarter boards and mirrors. |
|
j. |
Prepare and preserve decks, bulkheads and overheads. |
|
k. |
Replace deck covering. |
|
l. |
Replace any damaged insulation. |
|
m. |
Paint
bulkheads and overheads. |
|
|
| |
|
BMSG |
Complete Upgrade of STNCO Berthing Compartment(s)
INSTALLATION
REQUIREMENTS:
|
a. |
Replace berths with
CPO style berths with privacy partitions and berth curtains arranged
in six-man cubicles, as practical, with ten percent long berths.
Total number of new berths will be equal to the existing
berthing. |
|
b. |
Redistribute air
supply terminals to provide overhead diffusers for each berth
cubicle and modify recirculation system ducting to suit. |
|
c. |
Redistribute overhead
lighting to conform to new arrangements. Provide one berth light per
accommodation and mirror lights as required. |
|
d. |
Improve traffic flow
and privacy, as practical, through the arrangement of furniture. |
|
e. |
Provide lockers for
stowage of clothing and personal effects to meet or exceed minimums
required per accommodation in accordance with reference (a). |
|
f. |
Provide a means of
secondary egress if one does not exist and berthing capacity exceeds
21 personnel. |
|
g. |
Provide
recreation/lounge area in berthing compartment segregated from
sleeping area to the maximum extent feasible |
|
h. |
Relocate existing
rifle racks and helmet racks to suit new furniture and arrangements,
if applicable. |
|
i. |
Provide adequate
facilities for field pack stowage. |
|
j. |
Provide stowage for
iron and ironing board. |
|
k. |
Provide bulletin
boards, watch-quarter boards and mirrors. |
|
l. |
Prepare and preserve decks, bulkheads and overheads. |
|
m. |
Replace deck covering. |
|
n. |
Replace any damaged
insulation. |
|
o. |
Paint overheads and
bulkheads. |
|
|
| |
|
BTRM |
Complete Upgrade of Troop Berthing Compartment(s)
INSTALLATION REQUIREMENTS:
|
a. |
Replace berths with modular berths with privacy partitions and berth
curtains arranged in six-person cubicles, as practical, with ten
percent long berths. Total number of new berths will be equal to existing berthing. |
|
b. |
Redistribute air
supply terminals to provide overhead diffusers for each berth
cubicle and modify recirculation system ducting to suit. |
|
c. |
Redistribute overhead
lighting to conform to new arrangements. Provide one berth light per
accommodation and mirror lights as required. |
|
d. |
Improve traffic flow
and privacy, as practical, through the arrangement of furniture. |
|
e. |
Provide lockers for
stowage of clothing and personal effects to meet or exceed minimums
required per accommodation in accordance with reference (a). |
|
f. |
Provide a means of
secondary egress if one does not exist and berthing capacity exceeds
21 personnel. |
|
g. |
Provide
recreation/lounge area in berthing compartment segregated from
sleeping area to the maximum extent feasible |
|
h. |
Relocate existing
rifle racks and helmet racks to suit new furniture and arrangements,
if applicable. |
|
i. |
Provide adequate
facilities for field pack stowage. |
|
j. |
Provide stowage for
iron and ironing board. |
|
k. |
Provide bulletin
boards, watch-quarter boards and mirrors. |
|
l. |
Prepare and preserve decks, bulkheads and overheads. |
|
m. |
Replace deck covering. |
|
n. |
Replace any damaged
insulation. |
|
o. |
Paint overheads and
bulkheads. |
|
|
|
|
BOFF |
Complete Upgrade of Officer Stateroom(s)
INSTALLATION REQUIREMENTS:
|
a. |
Replace berths. Total number of new berths shall be equal to the
number of existing berth accommodations. One man or two man berths
will be a new replacement, and 3-man berths will be an improved full
width unit with privacy curtains. |
|
b. |
Improve traffic flow
and privacy, as practical, through the arrangement of furniture. |
|
c. |
Provide secretaries
and lockers for stowage of clothing and personal effects to meet or
exceed minimums required per accommodation in accordance with
reference (a). Secretaries include a new safe. |
|
d. |
Provide stainless
steel sink unit with storage space above and below sink and with
improved faucet and drain components. |
|
e. |
Provide chairs. |
|
f. |
Replace joiner doors. |
|
g. |
Provide accessories
and additional shelves, working surfaces and stowage as feasible. |
|
h. |
Replace ventilation
diffusers, and as feasible improve distribution of air. |
|
i. |
Redistribute overhead
lighting to conform to new arrangements. Provide one berth light per
accommodation and mirror lights at each sink. Lights within
secretaries will include a receptacle. |
|
j. |
Prepare and preserve
decks, bulkheads and overheads. |
|
k. |
Replace deck covering. |
|
l. |
Replace any damaged insulation. |
|
m. |
Paint overheads and
bulkheads. |
|
|
| |
Sanitary Projects: |
| |
|
HCPO |
Complete Upgrade of Chief Petty Officer's (CPO) Sanitary Space(s)
INSTALLATION REQUIREMENTS:
|
a. |
Remove
and replace fixtures in quantities to meet habitability standards.
Rearrange to provide required clearances, privacy and access. |
|
b. |
Install new Stainless Steel countertop lavatory units. |
|
c. |
Install new Stainless Steel water closet partitions supported from the overhead
and bulkhead. |
|
d. |
Install new Stainless Steel urinal supports and dividers, if
applicable. |
|
e. |
Install new Stainless Steel shower partitions and, if space permits, drying
areas. |
|
f. |
Install new accessories. |
|
g. |
Replace joiner doors. |
|
h. |
Replace electrical heaters |
|
i. |
Install cleaning gear locker and service sink or bucket fill area
with garden hose connection where practical. |
|
j. |
Modify
piping to suit new arrangement and replace any deteriorated piping. |
|
k. |
Modify
the ventilation distribution system for efficiency and to suit new
arrangement. |
|
l. |
As
space permits, either enclose or insulate any water heater located
within space. |
|
m. |
Install improved lighting and receptacles to accommodate the new
arrangement. |
|
n. |
Install new porcelain tile deck covering. |
|
o. |
Prepare and paint the sanitary space |
|
|
| |
|
HENL |
Complete Upgrade of Crew Sanitary Space(s)
INSTALLATION REQUIREMENTS:
|
a. |
Remove
and replace fixtures in quantities to meet habitability standards.
Rearrange to provide required clearances, privacy and access. |
|
b. |
Install new Stainless Steel countertop lavatory units. |
|
c. |
Install new Stainless Steel water closet partitions supported from the overhead
and bulkhead. |
|
d. |
Install new Stainless Steel urinal supports and dividers, if
applicable. |
|
e. |
Install new Stainless Steel shower partitions and, if space permits, drying
areas. |
|
f. |
Install new accessories. |
|
g. |
Replace joiner doors. |
|
h. |
Replace electrical heaters |
|
i. |
Install cleaning gear locker and service sink or bucket fill area
with garden hose connection where practical. |
|
j. |
Modify
piping to suit new arrangement and replace any deteriorated piping. |
|
k. |
Modify
the ventilation distribution system for efficiency and to suit new
arrangement. |
|
l. |
As
space permits, either enclose or insulate any water heater located
within space. |
|
m. |
Install improved lighting and receptacles to accommodate the new
arrangement. |
|
n. |
Install new porcelain tile deck covering. |
|
o. |
Prepare and paint the sanitary space |
|
|
| |
|
HMSG |
Complete Upgrade of STNCO Sanitary Space(s)
INSTALLATION REQUIREMENTS:
|
a. |
Remove
and replace fixtures in quantities to meet habitability standards.
Rearrange to provide required clearances, privacy and access. |
|
b. |
Install new Stainless Steel countertop lavatory units. |
|
c. |
Install new Stainless Steel water closet partitions supported from the overhead
and bulkhead. |
|
d. |
Install new Stainless Steel urinal supports and dividers, if
applicable. |
|
e. |
Install new Stainless Steel shower partitions and, if space permits, drying
areas. |
|
f. |
Install new accessories. |
|
g. |
Replace joiner doors. |
|
h. |
Replace electrical heaters |
|
i. |
Install cleaning gear locker and service sink or bucket fill area
with garden hose connection where practical. |
|
j. |
Modify
piping to suit new arrangement and replace any deteriorated piping. |
|
k. |
Modify
the ventilation distribution system for efficiency and to suit new
arrangement. |
|
l. |
As
space permits, either enclose or insulate any water heater located
within space. |
|
m. |
Install improved lighting and receptacles to accommodate the new
arrangement. |
|
n. |
Install new porcelain tile deck covering. |
|
o. |
Prepare and paint the sanitary space |
|
|
| |
|
HTRP |
Complete Upgrade of Troop Sanitary Space(s)
INSTALLATION REQUIREMENTS:
|
a. |
Remove
and replace fixtures in quantities to meet habitability standards.
Rearrange to provide required clearances, privacy and access. |
|
b. |
Install new Stainless Steel countertop lavatory units. |
|
c. |
Install new Stainless Steel water closet partitions supported from the overhead
and bulkhead. |
|
d. |
Install new Stainless Steel urinal supports and dividers, if
applicable. |
|
e. |
Install new Stainless Steel shower partitions and, if space permits, drying
areas. |
|
f. |
Install new accessories. |
|
g. |
Replace joiner doors. |
|
h. |
Replace electrical heaters |
|
i. |
Install cleaning gear locker and service sink or bucket fill area
with garden hose connection where practical. |
|
j. |
Modify
piping to suit new arrangement and replace any deteriorated piping. |
|
k. |
Modify
the ventilation distribution system for efficiency and to suit new
arrangement. |
|
l. |
As
space permits, either enclose or insulate any water heater located
within space. |
|
m. |
Install improved lighting and receptacles to accommodate the new
arrangement. |
|
n. |
Install new porcelain tile deck covering. |
|
o. |
Prepare and paint the sanitary space |
|
|